{"id":35864502,"date":"2021-01-12T14:12:48","date_gmt":"2021-01-12T13:12:48","guid":{"rendered":"https:\/\/www.arketipomagazine.it\/en\/?p=35864502"},"modified":"2021-01-12T14:15:51","modified_gmt":"2021-01-12T13:15:51","slug":"revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston","status":"publish","type":"post","link":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/","title":{"rendered":"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston"},"content":{"rendered":"<p class=\"paragraph\"><span class=\"normaltextrun\"><span lang=\"EN-US\">Construction has begun on the redesign of Boston\u2019s\u00a0Seaport World Trade Center, an expansive mixed-use development on\u00a0historic\u00a0<strong>Commonwealth Pier<\/strong> in the city\u2019s\u00a0Seaport District.\u00a0Designed by <strong>Schmidt Hammer Lassen<\/strong>,\u00a0the adaptive reuse project\u00a0will introduce\u00a0new\u00a0ways to\u00a0explore and\u00a0engage with\u00a0the waterfront. These include\u00a0a public plaza,\u00a0an enhanced\u00a0Harborwalk, retail,\u00a0and first-class Seaport Hotel event and meeting spaces, as well as a unique, flexible workplace.<br \/>\n<\/span><\/span><span class=\"normaltextrun\"><span lang=\"EN-US\">International real estate developer Pembroke turned to Schmidt Hammer Lassen, along with Boston-based architectural firm CBT, to honor the site\u2019s historic integrity while also introducing new materials, increasing daylight, and providing new points of connectivity. Commonwealth Pier was built more than 100 years ago and was once the largest of its kind in the world. The revitalization project, which is targeting LEED Gold Certification, incorporates advanced design strategies for resilience and sustainability to ensure the pier\u2019s continued enjoyment for generations to come.\u00a0<\/span><\/span><\/p><div id=\"arket-1016526761\" class=\"arket-contenuto\" style=\"margin-top: 20px;margin-bottom: 20px;\"><div id=\"sas_67408\" align=\"center\"><\/div>\r\n<script type=\"application\/javascript\">\r\n    sas.cmd.push(function() {\r\n        sas.render(\"67408\");  \/\/ Formato : Injection 1x1 1x1\r\n    });\r\n<\/script><\/div>\n<p><a href=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-35864503\" src=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg\" alt=\"\" width=\"1400\" height=\"990\" srcset=\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg 1400w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE-300x212.jpg 300w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE-1024x724.jpg 1024w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE-768x543.jpg 768w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE-100x70.jpg 100w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE-696x492.jpg 696w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE-1068x755.jpg 1068w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-01_CITYSCAPE-DIGITAL-FOR-PEMBROKE-594x420.jpg 594w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><\/a><\/p>\n<p class=\"paragraph\"><span class=\"normaltextrun\"><span lang=\"EN-US\">\u201c<em>We\u2019re thrilled to start construction and take another step forward with our revitalization of Commonwealth Pier. This project reintroduces the Pier as a new destination in what has become a thriving neighborhood<\/em>,\u201d said <strong>Andrew Dankwerth<\/strong>, Senior Vice President, Design &amp; Development at Pembroke. \u201c<em>This revitalization will bring new life to this iconic building, reconnecting it to the harbor and the neighborhood by creating a unique waterfront experience for Boston<\/em><\/span><\/span><span class=\"normaltextrun\"><span lang=\"EN-US\">\u201d.<br \/>\n<\/span><\/span><span class=\"normaltextrun\"><span lang=\"EN-US\">\u201c<em>In our approach to the Commonwealth Pier\u2019s transformation we have tried to be mindful and meticulous<\/em>,\u201d said <strong>Kristian Ahlmark<\/strong>, Partner and Design Director at Schmidt Hammer Lassen. \u201c<em>We approached the place with curiosity and precision, and carefully assessed what we found important to preserve &#8211; both architecturally and culturally. We engaged in a continuous conversation with the building throughout the process, which was done in close collaboration with Pembroke and the many great consultants that have been a part of this journey<\/em>\u201d.<\/span><\/span><\/p>\n<p><a href=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-35864504\" src=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg\" alt=\"\" width=\"1400\" height=\"862\" srcset=\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg 1400w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE-300x185.jpg 300w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE-1024x630.jpg 1024w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE-768x473.jpg 768w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE-356x220.jpg 356w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE-696x429.jpg 696w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE-1068x658.jpg 1068w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-02_CITYSCAPE-DIGITAL-FOR-PEMBROKE-682x420.jpg 682w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><\/a><\/p>\n<p class=\"paragraph\"><span class=\"normaltextrun\"><span lang=\"EN-US\">Schmidt Hammer Lassen\u2019s design of the site includes enhanced outdoor\u00a0spaces and public amenities, including courtyards, walkways, green\u00a0spaces, and a grand\u00a0waterfront\u00a0plaza. The plaza\u00a0will become the\u00a0pier\u2019s\u00a0central gathering point, providing a\u00a0flexible outdoor space\u00a0for\u00a0year-round\u00a0activities. It\u00a0will feature,\u00a0tree plantings, custom seating, and areas for moveable tables and chairs.<br \/>\n<\/span><\/span><span class=\"normaltextrun\"><span lang=\"EN-US\">The Harborwalk, a popular paved pedestrian path along Boston Harbor, runs along the site\u2019s perimeter and views to downtown Boston, East Boston, and the Boston Harbor. There, too, Schmidt Hammer Lassen designed spaces to accommodate custom seating, integrated planters, and outdoor lighting &#8211; all of which will allow for a dynamic visitor experience. Niches in the building\u2019s fa\u00e7ade will provide additional public seating, shaded areas, and connectivity to retail and dining.\u00a0<\/span><\/span><\/p>\n<p><a href=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-35864505\" src=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg\" alt=\"\" width=\"1400\" height=\"990\" srcset=\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE.jpg 1400w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE-300x212.jpg 300w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE-1024x724.jpg 1024w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE-768x543.jpg 768w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE-100x70.jpg 100w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE-696x492.jpg 696w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE-1068x755.jpg 1068w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/credit-03_CITYSCAPE-DIGITAL-FOR-PEMBROKE-594x420.jpg 594w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><\/a><\/p>\n<p class=\"paragraph\"><span class=\"normaltextrun\"><span lang=\"EN-US\">Schmidt Hammer Lassen\u2019s\u00a0design intent\u00a0for Commonwealth Pier\u00a0is to\u00a0preserve the building\u2019s unique heritage while\u00a0making it a highly attractive modern-day destination. The\u00a0stone arches and cornice\u00a0of the\u00a0historic neo-classical headhouse\u00a0will remain intact. The fa\u00e7ade of the building\u2019s northern extension\u00a0will\u00a0include\u00a0exposed columns and column connections\u00a0from the original structure.\u00a0With the introduction of curtain\u00a0wall and other\u00a0lightweight\u00a0materials, the building will integrate seamlessly into its neighborhood context.<br \/>\n<\/span><\/span><span class=\"normaltextrun\"><span lang=\"EN-US\">\u201c<em>When working on an existing structure, the most significant architectural statement is often made through what is left untouched or enhanced. This project has been about unleashing the inherent potential of the building as a natural gathering point and an urban living room of the entire seaport district<\/em>,\u201d explained Ahlmark.<\/span><\/span><\/p>\n<p class=\"paragraph\"><span class=\"normaltextrun\"><span lang=\"EN-US\"><a href=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-35864506\" src=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03.jpg\" alt=\"\" width=\"1400\" height=\"990\" srcset=\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03.jpg 1400w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03-300x212.jpg 300w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03-1024x724.jpg 1024w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03-768x543.jpg 768w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03-100x70.jpg 100w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03-696x492.jpg 696w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03-1068x755.jpg 1068w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-03-594x420.jpg 594w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><\/a><\/span><\/span><span class=\"normaltextrun\"><span lang=\"EN-US\">Commonwealth Pier is Schmidt Hammer Lassen\u2019s second U.S. project.\u00a0In December 2018,\u00a0the practice\u2019s mixed-use\u00a0Monroe Blocks project in Detroit, Michigan\u00a0broke ground, and in 2020,\u00a0it announced an expansion\u00a0into North America in partnership with its parent firm, Perkins&amp;Will.<\/span><\/span><\/p>\n<p><a href=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-35864507\" src=\"https:\/\/www.arketipomagazine.it\/wp-content\/uploads\/sites\/20\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04.jpg\" alt=\"\" width=\"1400\" height=\"991\" srcset=\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04.jpg 1400w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04-300x212.jpg 300w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04-1024x725.jpg 1024w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04-768x544.jpg 768w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04-100x70.jpg 100w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04-696x493.jpg 696w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04-1068x756.jpg 1068w, https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_visual-04-593x420.jpg 593w\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction has begun on the redesign of Boston\u2019s\u00a0Seaport World Trade Center, an expansive mixed-use development on\u00a0historic\u00a0Commonwealth Pier in the city\u2019s\u00a0Seaport District.\u00a0Designed by Schmidt Hammer Lassen,\u00a0the adaptive reuse project\u00a0will introduce\u00a0new\u00a0ways to\u00a0explore and\u00a0engage with\u00a0the waterfront. These include\u00a0a public plaza,\u00a0an enhanced\u00a0Harborwalk, retail,\u00a0and first-class Seaport Hotel event and meeting spaces, as well as a unique, flexible workplace. International real<\/p>\n","protected":false},"author":807,"featured_media":35864508,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[20007,20006,20005,20008,19382],"contenuto-extra":[],"class_list":["post-35864502","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","tag-andrew-dankwerth","tag-boston","tag-commonwealth-pier","tag-kristian-ahlmark","tag-schmidt-hammer-lassen-architects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston<\/title>\n<meta name=\"description\" content=\"The project designed by Schmidt Hammer Lassen Architects, for the revitalization of Commonwealth Pier in Boston, starts construction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston\" \/>\n<meta property=\"og:description\" content=\"The project designed by Schmidt Hammer Lassen Architects, for the revitalization of Commonwealth Pier in Boston, starts construction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/\" \/>\n<meta property=\"og:site_name\" content=\"Arketipo\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pages\/Arketipo-Magazine\/276056037507\" \/>\n<meta property=\"article:published_time\" content=\"2021-01-12T13:12:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-12T13:15:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"1003\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Chiara Scalco\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ArketipoMag\" \/>\n<meta name=\"twitter:site\" content=\"@ArketipoMag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Chiara Scalco\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/\"},\"author\":{\"name\":\"Chiara Scalco\",\"@id\":\"https:\/\/www.arketipomagazine.it\/#\/schema\/person\/b9da7d735da19f022b20f015475756d8\"},\"headline\":\"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston\",\"datePublished\":\"2021-01-12T13:12:48+00:00\",\"dateModified\":\"2021-01-12T13:15:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/\"},\"wordCount\":620,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg\",\"keywords\":[\"Andrew Dankwerth\",\"Boston\",\"Commonwealth Pier\",\"Kristian Ahlmark\",\"Schmidt Hammer Lassen Architects\"],\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/\",\"url\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/\",\"name\":\"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston\",\"isPartOf\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg\",\"datePublished\":\"2021-01-12T13:12:48+00:00\",\"dateModified\":\"2021-01-12T13:15:51+00:00\",\"author\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/#\/schema\/person\/b9da7d735da19f022b20f015475756d8\"},\"description\":\"The project designed by Schmidt Hammer Lassen Architects, for the revitalization of Commonwealth Pier in Boston, starts construction.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage\",\"url\":\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg\",\"contentUrl\":\"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg\",\"width\":1400,\"height\":1003},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.arketipomagazine.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.arketipomagazine.it\/en\/category\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.arketipomagazine.it\/#website\",\"url\":\"https:\/\/www.arketipomagazine.it\/\",\"name\":\"Arketipo\",\"description\":\"Architecture and Engineering International Magazine\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.arketipomagazine.it\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.arketipomagazine.it\/#\/schema\/person\/b9da7d735da19f022b20f015475756d8\",\"name\":\"Chiara Scalco\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/4996622122901d2b076f712417c9ca592a764d9f08567847a4f2c06e2e0e8bd0?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/4996622122901d2b076f712417c9ca592a764d9f08567847a4f2c06e2e0e8bd0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/4996622122901d2b076f712417c9ca592a764d9f08567847a4f2c06e2e0e8bd0?s=96&d=mm&r=g\",\"caption\":\"Chiara Scalco\"},\"url\":\"https:\/\/www.arketipomagazine.it\/en\/author\/cscalco\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston","description":"The project designed by Schmidt Hammer Lassen Architects, for the revitalization of Commonwealth Pier in Boston, starts construction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/","og_locale":"en_US","og_type":"article","og_title":"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston","og_description":"The project designed by Schmidt Hammer Lassen Architects, for the revitalization of Commonwealth Pier in Boston, starts construction.","og_url":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/","og_site_name":"Arketipo","article_publisher":"https:\/\/www.facebook.com\/pages\/Arketipo-Magazine\/276056037507","article_published_time":"2021-01-12T13:12:48+00:00","article_modified_time":"2021-01-12T13:15:51+00:00","og_image":[{"width":1400,"height":1003,"url":"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg","type":"image\/jpeg"}],"author":"Chiara Scalco","twitter_card":"summary_large_image","twitter_creator":"@ArketipoMag","twitter_site":"@ArketipoMag","twitter_misc":{"Written by":"Chiara Scalco","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#article","isPartOf":{"@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/"},"author":{"name":"Chiara Scalco","@id":"https:\/\/www.arketipomagazine.it\/#\/schema\/person\/b9da7d735da19f022b20f015475756d8"},"headline":"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston","datePublished":"2021-01-12T13:12:48+00:00","dateModified":"2021-01-12T13:15:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/"},"wordCount":620,"commentCount":0,"image":{"@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage"},"thumbnailUrl":"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg","keywords":["Andrew Dankwerth","Boston","Commonwealth Pier","Kristian Ahlmark","Schmidt Hammer Lassen Architects"],"articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/","url":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/","name":"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston","isPartOf":{"@id":"https:\/\/www.arketipomagazine.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage"},"image":{"@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage"},"thumbnailUrl":"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg","datePublished":"2021-01-12T13:12:48+00:00","dateModified":"2021-01-12T13:15:51+00:00","author":{"@id":"https:\/\/www.arketipomagazine.it\/#\/schema\/person\/b9da7d735da19f022b20f015475756d8"},"description":"The project designed by Schmidt Hammer Lassen Architects, for the revitalization of Commonwealth Pier in Boston, starts construction.","breadcrumb":{"@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#primaryimage","url":"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg","contentUrl":"https:\/\/static.tecnichenuove.it\/arketipomagazine\/2020\/10\/SHL-Architects_Seaport-WTC-Boston_Water-view.jpg","width":1400,"height":1003},{"@type":"BreadcrumbList","@id":"https:\/\/www.arketipomagazine.it\/en\/revitalization-of-commonwealth-pier-schmidt-hammer-lassen-boston\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.arketipomagazine.it\/en\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.arketipomagazine.it\/en\/category\/projects\/"},{"@type":"ListItem","position":3,"name":"Revitalization of Commonwealth Pier, Schmidt Hammer Lassen, Boston"}]},{"@type":"WebSite","@id":"https:\/\/www.arketipomagazine.it\/#website","url":"https:\/\/www.arketipomagazine.it\/","name":"Arketipo","description":"Architecture and Engineering International Magazine","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.arketipomagazine.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.arketipomagazine.it\/#\/schema\/person\/b9da7d735da19f022b20f015475756d8","name":"Chiara Scalco","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4996622122901d2b076f712417c9ca592a764d9f08567847a4f2c06e2e0e8bd0?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4996622122901d2b076f712417c9ca592a764d9f08567847a4f2c06e2e0e8bd0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4996622122901d2b076f712417c9ca592a764d9f08567847a4f2c06e2e0e8bd0?s=96&d=mm&r=g","caption":"Chiara Scalco"},"url":"https:\/\/www.arketipomagazine.it\/en\/author\/cscalco\/"}]}},"_links":{"self":[{"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/posts\/35864502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/users\/807"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/comments?post=35864502"}],"version-history":[{"count":3,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/posts\/35864502\/revisions"}],"predecessor-version":[{"id":35876425,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/posts\/35864502\/revisions\/35876425"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/media\/35864508"}],"wp:attachment":[{"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/media?parent=35864502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/categories?post=35864502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/tags?post=35864502"},{"taxonomy":"contenuto-extra","embeddable":true,"href":"https:\/\/www.arketipomagazine.it\/en\/wp-json\/wp\/v2\/contenuto-extra?post=35864502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}